PCB shielding clip for shielding cover

FOB Reference Price:Get Latest Price
$0.01 - $0.012 / Piece | 10000 Piece/Pieces (Min. Order)
Shipping:
Support Sea freight
Report Suspicious Activity
Overview
Quick Details
Place of Origin:
Guangdong, China
Brand Name:
Welin
Model Number:
Welin-SC001
Material:
Stainless steel 304
Product name:
Welin
Product No:
KD-PBJ001
Thickness:
0.15mm
Finish:
Sn plating on both sides
Size:
0.15*6.7*0.9mm
Quantity/reel:
10000pcs
Package:
reel and tape
Usage:
for 0.2mm thickness shielding cover
Function:
replace shielding frame to save cost
Supply Ability
Supply Ability:
100000000 Piece/Pieces per Month
Packaging & Delivery
Packaging Details
reel and tape ,carton boxes
Port
shenzhen
Lead Time :
3-4days
Product Description
Product Name
Shielding clip
Material
stainless steel 304
Size
0.15*6.7*0.9mm
Finish
Sn plating on both sides
Quantity
10000pcs/reel
Available 
0.2mm shielding case/cover/fence
Package
reel and tape,carton boxes
Advantage
replacing shielding case/cover/fence to reduce the costs of PCB’s production, inspection, maintenance
Products Show
Our Company

Factory

Our Factory

Workshop

Our Workshop

The advantage of shielding clip replacing the shielding frame:

1, Reducing the costs of PCB’s production, inspection, maintenance ,etc.
2, Easing for SMT production, and preferably dividing the shielding area in order to strengthen the shielding’s effect.
3, Shielding clip has good elasticity, and easy to be welded, and apply to SMD packaging.
4, After SMT production , then put the shielding case with shielding clip on PCB. Once need to maintenance PCB , just need directly removed the shielding case from the shielding clip, 



and no longer need to remove it by high temperature which can avoid the high temperature will destroy the motherboard. Highly reduces the damage rate of repairing board. So Shielding clip is the best product of replacing the shielding frame.
5, Shielding clip’s production craft, material, weldability , flatness and packaging requirements are more economic than producing shielding frame.

Packing & Delivery

Packing Details  : 10000pcs/reel+carton boxes

Delivery Details : Generally it is 3-4 days if the goods are in stock. or it is 5-7 days if the goods are not in stock, it is according to quantity.

1. Special logistics packaging
2. Suitable carton size
3. Shock bubble film
Certifications
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 3-4 days if the goods are in stock. or it is 5-7 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: